Mobile Urban Development Department
Home > Board of Adjustment

Urban Development
Code Administration
Building Inspection Unit
Electrical Inspection Unit
Mechanical Inspection Unit
Plumbing Inspection Unit

Planning
Board of Adjustment
Land Use Administration / GIS (Zoning)
Long Range Planning
Planning Commission

Urban Forestry
Development
Arboriculture
Mobile Tree Commission

Safety Unit

Technical Review Committee (TRC)

FAQs and TimeSavers

Forms and Applications

Web Mapping

Urban Development
Mailing Address:

P.O. Box 1827
Mobile, AL 36633-1827

Physical Address:
Downtown Office
205 Government St.
South Tower, 3rd Floor
Mobile, AL 36644
Phone: (251) 208-7198
Fax: (251) 208-7896

West Mobile Office
4851 Museum Drive
Mobile, AL 36608
Phone: (251) 208-1537
Fax: (251) 208-1539


Urban Development

To view a Staff Report, click on "Download Staff Report"; to view a letter of decision, click on "Download Letter of Decision"

Previous | Number 6 of 7 | Next
Original Search

Case: #5284(Case #ZON2004-02338)
Case Type: Holdovers

Foresite LLC (Mobile County School Board, Owners)

(North side of Cottage Hill Road, ¼ mile+ West of Azalea Road)Use, Height, Setback, Separation Buffer and Access Variances to allow the construction of a 160’ Monopole Communication Tower in an R-1, Single-Family Residential District, towers are prohibited in R-1 Districts; to allow the tower to be 160’ in height, the maximum height allowed in a R-1 District is 35’; to allow the construction of said tower to within 40’ from a lease parcel line, a minimum setback of 160’ is required; to allow construction of the tower within 160’ of residentially zoned property, a minimum separation buffer of 240’ is required; and to allow unimproved parking and access to the site, paved parking and access is required for all towers except those located in I-2 Districts.


Download Staff Report


Download Letter of Decision

Previous | Number 6 of 7 | Next
Original Search


©1999-2013 City of Mobile, All Rights Reserved
Privacy PolicyWeb Site Accessibility Statement
Questions or Comments, Email the Webmaster
Web Site Design by Dogwood Productions